RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2512028437 - Archived data from Wed, 14. April 2021 16:34:20 CEST


This is all the information about APD 2512028437. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2512028437
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E04
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.6 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 179
Position in Box: 47
EP1 batch: 31
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5330391 V     T = -25 °C: 345.2252734 V
Voltage for Gain 150: T = +20 °C: 388.3445846 V     T = -25 °C: 352.5542779 V
Voltage for Gain 200: T = +20 °C: 392.6991409 V     T = -25 °C: 356.6619396 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.51497896 V-1     T = -25 °C: 4.962272141 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.931811616 V-1     T = -25 °C: 9.250132855 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.83893081 V-1     T = -25 °C: 14.72457351 V-1
Break-through voltage: T = +20 °C: 408.2469421 V     T = -25 °C: 371.8905755 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2022 10:54:44 CET oafedulidis Assigned to capsule by script
14. Apr 2021 16:34:20 CEST jreher Updated box and position via API.
05. Feb 2021 11:11:25 CET jreher Updated box and position via API.
11. Aug 2020 17:32:01 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:40 CET jreher Updated APD location via API.
25. Nov 2019 17:25:01 CET jreher Updated box and position via API.
30. Jul 2019 15:19:11 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:52:37 CEST markus.moritz
05. Jul 2019 14:50:32 CEST jreher Updated APD location via API.
24. Jun 2019 16:12:59 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:22 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:07 CET Tobias Imported from Hamamatsu datasheet.