RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2512028432 - Archived data from Tue, 11. August 2020 17:32:00 CEST


This is all the information about APD 2512028432. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2512028432
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 179
Position in Box: 43
EP1 batch: 31
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.4833179 V     T = -25 °C: 345.2575044 V
Voltage for Gain 150: T = +20 °C: 388.2901986 V     T = -25 °C: 352.5776364 V
Voltage for Gain 200: T = +20 °C: 392.6374977 V     T = -25 °C: 356.6775574 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.531767187 V-1     T = -25 °C: 4.912376017 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.953679706 V-1     T = -25 °C: 9.219043395 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.92983962 V-1     T = -25 °C: 16.62925355 V-1
Break-through voltage: T = +20 °C: 408.2031015 V     T = -25 °C: 371.9613494 V
   
Notes:


Version history

Time Author Change comment
14. Apr 2021 16:34:21 CEST jreher Updated box and position via API.
05. Feb 2021 11:11:25 CET jreher Updated box and position via API.
11. Aug 2020 17:32:00 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:40 CET jreher Updated APD location via API.
25. Nov 2019 17:25:00 CET jreher Updated box and position via API.
30. Jul 2019 15:19:11 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:51:23 CEST markus.moritz
05. Jul 2019 14:50:32 CEST jreher Updated APD location via API.
24. Jun 2019 16:12:59 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:21 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:07 CET Tobias Imported from Hamamatsu datasheet.