RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2512028419 - Archived data from Tue, 11. August 2020 17:31:58 CEST


This is all the information about APD 2512028419. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2512028419
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 179
Position in Box: 30
EP1 batch: 30
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5103014 V     T = -25 °C: 346.0143854 V
Voltage for Gain 150: T = +20 °C: 388.5309029 V     T = -25 °C: 353.3405612 V
Voltage for Gain 200: T = +20 °C: 393.0240425 V     T = -25 °C: 357.4635314 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.450071687 V-1     T = -25 °C: 5.117569132 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.749193515 V-1     T = -25 °C: 9.400599301 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.13601179 V-1     T = -25 °C: 15.43034923 V-1
Break-through voltage: T = +20 °C: 409.4274578 V     T = -25 °C: 373.0699989 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:23 CET jreher Updated box and position via API.
07. Oct 2020 12:17:47 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:48 CEST jreher Updated box and position via API.
11. Aug 2020 17:31:58 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:13 CET jreher Updated box and position via API.
27. Nov 2019 20:00:39 CET jreher Updated APD location via API.
25. Nov 2019 17:25:00 CET jreher Updated box and position via API.
30. Jul 2019 15:18:52 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:39:07 CEST markus.moritz
05. Jul 2019 14:50:31 CEST jreher Updated APD location via API.
24. Jun 2019 16:14:05 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:21 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:06 CET Tobias Imported from Hamamatsu datasheet.