RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2511028376 - Archived data from Tue, 11. August 2020 17:31:53 CEST


This is all the information about APD 2511028376. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2511028376
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 5.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 179
Position in Box: 5
EP1 batch: 30
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4421344 V     T = -25 °C: 344.530989 V
Voltage for Gain 150: T = +20 °C: 387.2881217 V     T = -25 °C: 351.8272443 V
Voltage for Gain 200: T = +20 °C: 391.6721109 V     T = -25 °C: 355.9137624 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.466218737 V-1     T = -25 °C: 4.842887572 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.836419555 V-1     T = -25 °C: 9.9640198 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.62823964 V-1     T = -25 °C: 16.12916482 V-1
Break-through voltage: T = +20 °C: 407.4543676 V     T = -25 °C: 371.1800294 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:17 CET jreher Assigned to capsule by script
05. Feb 2021 11:11:20 CET jreher Updated box and position via API.
18. Dec 2020 13:59:53 CET jreher Updated box and position via API.
11. Aug 2020 17:31:53 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:37 CET jreher Updated APD location via API.
25. Nov 2019 17:24:58 CET jreher Updated box and position via API.
30. Jul 2019 15:18:31 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:30:29 CEST markus.moritz
05. Jul 2019 14:50:29 CEST jreher Updated APD location via API.
24. Jun 2019 16:14:03 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:20 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:06 CET Tobias Imported from Hamamatsu datasheet.