RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2511028372 - Archived data from Fri, 05. February 2021 11:11:20 CET


This is all the information about APD 2511028372. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2511028372
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A07
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.6 V
Dark current: 5.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 179
Position in Box: 1
EP1 batch: 29
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.2561142 V     T = -25 °C: 351.5149492 V
Voltage for Gain 150: T = +20 °C: 395.2344836 V     T = -25 °C: 359.0708552 V
Voltage for Gain 200: T = +20 °C: 399.6814763 V     T = -25 °C: 363.2992711 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.51164915 V-1     T = -25 °C: 4.676712024 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.778376486 V-1     T = -25 °C: 9.338558256 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.26635463 V-1     T = -25 °C: 14.79402473 V-1
Break-through voltage: T = +20 °C: 414.3886071 V     T = -25 °C: 378.1132515 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:41:38 CET oafedulidis Assigned to capsule by script
27. Aug 2021 10:31:11 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:20 CET jreher Updated box and position via API.
11. Aug 2020 17:31:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:37 CET jreher Updated APD location via API.
25. Nov 2019 17:24:57 CET jreher Updated box and position via API.
30. Jul 2019 15:18:31 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:27:54 CEST markus.moritz
05. Jul 2019 14:50:29 CEST jreher Updated APD location via API.
24. Jun 2019 16:14:40 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:20 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:06 CET Tobias Imported from Hamamatsu datasheet.