RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2511028359 - Archived data from Fri, 05. February 2021 11:10:38 CET


This is all the information about APD 2511028359. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2511028359
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 38
EP1 batch: 29
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.065102 V     T = -25 °C: 344.7037491 V
Voltage for Gain 150: T = +20 °C: 387.8718438 V     T = -25 °C: 352.0307084 V
Voltage for Gain 200: T = +20 °C: 392.2144026 V     T = -25 °C: 356.1360675 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.644228697 V-1     T = -25 °C: 4.744644309 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.233171767 V-1     T = -25 °C: 9.748892997 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.62634094 V-1     T = -25 °C: 15.56537037 V-1
Break-through voltage: T = +20 °C: 407.8303664 V     T = -25 °C: 371.5191654 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:01 CEST jreher Updated box and position via API.
14. Apr 2021 18:13:23 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:10:38 CET jreher Updated box and position via API.
11. Aug 2020 17:31:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:33 CET jreher Updated APD location via API.
25. Nov 2019 17:24:32 CET jreher Updated box and position via API.
30. Jul 2019 15:18:30 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:24:02 CEST markus.moritz
05. Jul 2019 13:59:10 CEST jreher Updated APD location via API.
24. Jun 2019 16:14:39 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:20 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:06 CET Tobias Imported from Hamamatsu datasheet.