RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2511028357 - Archived data from Tue, 11. August 2020 17:31:49 CEST


This is all the information about APD 2511028357. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2511028357
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 36
EP1 batch: 29
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.9102704 V     T = -25 °C: 342.9826327 V
Voltage for Gain 150: T = +20 °C: 385.8143765 V     T = -25 °C: 350.3462173 V
Voltage for Gain 200: T = +20 °C: 390.2302018 V     T = -25 °C: 354.489742 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.658274423 V-1     T = -25 °C: 4.960264665 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.202334761 V-1     T = -25 °C: 9.347066412 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.39027532 V-1     T = -25 °C: 14.79200602 V-1
Break-through voltage: T = +20 °C: 406.4908749 V     T = -25 °C: 370.1869682 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:38 CET jreher Updated box and position via API.
07. Oct 2020 12:18:33 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:00 CEST jreher Updated box and position via API.
11. Aug 2020 17:31:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:33 CET jreher Updated APD location via API.
25. Nov 2019 17:24:32 CET jreher Updated box and position via API.
30. Jul 2019 15:18:30 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:23:30 CEST markus.moritz
05. Jul 2019 13:59:10 CEST jreher Updated APD location via API.
24. Jun 2019 16:14:39 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:20 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:06 CET Tobias Imported from Hamamatsu datasheet.