RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2511028355 - Archived data from Mon, 26. April 2021 14:31:02 CEST


This is all the information about APD 2511028355. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2511028355
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B11
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.8 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 26
EP1 batch: 29
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.5393364 V     T = -25 °C: 353.2179478 V
Voltage for Gain 150: T = +20 °C: 397.3478129 V     T = -25 °C: 360.7632476 V
Voltage for Gain 200: T = +20 °C: 401.6938739 V     T = -25 °C: 364.9675788 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.430552546 V-1     T = -25 °C: 4.765735567 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.896658709 V-1     T = -25 °C: 8.786599975 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.90757795 V-1     T = -25 °C: 15.63559512 V-1
Break-through voltage: T = +20 °C: 416.1531806 V     T = -25 °C: 379.9360468 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:45:54 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:15:52 CEST oafedulidis Updated box and position via API.
26. Apr 2021 14:31:02 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:37 CET jreher Updated box and position via API.
11. Aug 2020 17:31:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:33 CET jreher Updated APD location via API.
25. Nov 2019 17:24:32 CET jreher Updated box and position via API.
30. Jul 2019 15:18:29 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:22:57 CEST markus.moritz
05. Jul 2019 13:59:09 CEST jreher Updated APD location via API.
24. Jun 2019 16:14:38 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:19 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:06 CET Tobias Imported from Hamamatsu datasheet.