RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2511028353 - Archived data from Wed, 16. June 2021 16:00:50 CEST


This is all the information about APD 2511028353. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2511028353
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D14
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.5 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 24
EP1 batch: 29
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.7573715 V     T = -25 °C: 350.9507844 V
Voltage for Gain 150: T = +20 °C: 394.6385334 V     T = -25 °C: 358.4192182 V
Voltage for Gain 200: T = +20 °C: 398.9937832 V     T = -25 °C: 362.6166024 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.370765052 V-1     T = -25 °C: 4.88354395 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.522259754 V-1     T = -25 °C: 9.17836407 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.95450735 V-1     T = -25 °C: 14.42253717 V-1
Break-through voltage: T = +20 °C: 413.7040253 V     T = -25 °C: 377.3916073 V
   
Notes:


Version history

Time Author Change comment
19. Nov 2021 13:05:35 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:39 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:50 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:35 CEST oafedulidis Updated box and position via API.
26. Apr 2021 14:31:02 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:37 CET jreher Updated box and position via API.
11. Aug 2020 17:31:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:33 CET jreher Updated APD location via API.
25. Nov 2019 17:24:32 CET jreher Updated box and position via API.
30. Jul 2019 15:18:29 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:22:24 CEST markus.moritz
05. Jul 2019 13:59:09 CEST jreher Updated APD location via API.
24. Jun 2019 16:14:38 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:19 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:06 CET Tobias Imported from Hamamatsu datasheet.