RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2511028334 - Archived data from Tue, 11. August 2020 17:31:45 CEST


This is all the information about APD 2511028334. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2511028334
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.8 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 13
EP1 batch: 28
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5032912 V     T = -25 °C: 344.917269 V
Voltage for Gain 150: T = +20 °C: 387.4216717 V     T = -25 °C: 352.2305097 V
Voltage for Gain 200: T = +20 °C: 391.8477973 V     T = -25 °C: 356.3339618 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.577126156 V-1     T = -25 °C: 4.660627302 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.895242719 V-1     T = -25 °C: 9.612144054 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.715606 V-1     T = -25 °C: 15.69196666 V-1
Break-through voltage: T = +20 °C: 407.8401642 V     T = -25 °C: 371.6904879 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:38:52 CET jreher Assigned to capsule by script
05. Feb 2021 11:10:35 CET jreher Updated box and position via API.
18. Dec 2020 14:00:04 CET jreher Updated box and position via API.
11. Aug 2020 17:31:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:31 CET jreher Updated APD location via API.
25. Nov 2019 17:24:30 CET jreher Updated box and position via API.
30. Jul 2019 15:18:14 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:16:08 CEST markus.moritz
05. Jul 2019 13:59:08 CEST jreher Updated APD location via API.
24. Jun 2019 16:15:11 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:19 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:05 CET Tobias Imported from Hamamatsu datasheet.