RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2511028322 - Archived data from Fri, 05. February 2021 11:10:34 CET


This is all the information about APD 2511028322. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2511028322
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.9 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 173
Position in Box: 1
EP1 batch: 28
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.1063389 V     T = -25 °C: 349.2526047 V
Voltage for Gain 150: T = +20 °C: 392.1382572 V     T = -25 °C: 356.6795718 V
Voltage for Gain 200: T = +20 °C: 396.6094287 V     T = -25 °C: 360.8391531 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.565711853 V-1     T = -25 °C: 4.963617508 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.906567347 V-1     T = -25 °C: 9.147213527 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.97643478 V-1     T = -25 °C: 14.53029901 V-1
Break-through voltage: T = +20 °C: 412.4952536 V     T = -25 °C: 376.1733079 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:30:59 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:34 CET jreher Updated box and position via API.
11. Aug 2020 17:31:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:30 CET jreher Updated APD location via API.
25. Nov 2019 17:24:29 CET jreher Updated box and position via API.
30. Jul 2019 15:18:14 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:12:13 CEST markus.moritz
05. Jul 2019 13:59:07 CEST jreher Updated APD location via API.
24. Jun 2019 16:15:10 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:18 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:05 CET Tobias Imported from Hamamatsu datasheet.