RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028314 - Archived data from Thu, 03. January 2019 00:12:18 CET


This is all the information about APD 2510028314. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028314
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: unknown
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 11.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 172
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:31 CET jreher Updated box and position via API.
11. Aug 2020 17:31:42 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:21 CET jreher Updated box and position via API.
27. Nov 2019 19:59:23 CET jreher Updated APD location via API.
25. Nov 2019 17:24:28 CET jreher Updated box and position via API.
30. Jul 2019 15:17:58 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:10:56 CEST markus.moritz
05. Jul 2019 13:59:02 CEST jreher Updated APD location via API.
24. Jun 2019 16:15:09 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:18 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:05 CET Tobias Imported from Hamamatsu datasheet.