RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028313 - Archived data from Tue, 11. August 2020 17:31:42 CEST


This is all the information about APD 2510028313. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028313
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.9 V
Dark current: 6.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 172
Position in Box: 43
EP1 batch: 28
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.582247 V     T = -25 °C: 348.9508496 V
Voltage for Gain 150: T = +20 °C: 392.4105527 V     T = -25 °C: 356.4023896 V
Voltage for Gain 200: T = +20 °C: 396.7525653 V     T = -25 °C: 360.5809874 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.411473407 V-1     T = -25 °C: 4.841086284 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.818971379 V-1     T = -25 °C: 9.162876519 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.58285573 V-1     T = -25 °C: 14.51198527 V-1
Break-through voltage: T = +20 °C: 412.3157482 V     T = -25 °C: 376.186056 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:19:36 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:19:38 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:31 CET jreher Updated box and position via API.
11. Aug 2020 17:31:42 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:23 CET jreher Updated APD location via API.
25. Nov 2019 17:24:28 CET jreher Updated box and position via API.
30. Jul 2019 15:17:58 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:10:42 CEST markus.moritz
05. Jul 2019 13:59:02 CEST jreher Updated APD location via API.
24. Jun 2019 16:15:09 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:18 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:05 CET Tobias Imported from Hamamatsu datasheet.