Show Hamamatsu Avalanche Photo Diode 2510028311 - Archived data from Tue, 06. October 2020 16:52:31 CEST
This is all the information about APD 2510028311. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2510028311 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | F12 |
Break-through voltage: | 409 V |
Voltage for Gain 100 (T=+25°C): | 380.2 V |
Dark current: | 6 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 172 |
Position in Box: | 41 |
EP1 batch: | 27 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 16. Jul 2019 |
Sent for analysis after irradiation: | 19. Jul 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 16. Jul 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 17. Jul 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 380.0938668 V T = -25 °C: 344.9703798 V |
Voltage for Gain 150: | T = +20 °C: 387.9337599 V T = -25 °C: 352.3184927 V |
Voltage for Gain 200: | T = +20 °C: 392.2888935 V T = -25 °C: 356.4431189 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.621341223 V-1 T = -25 °C: 5.029285386 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.203949625 V-1 T = -25 °C: 9.363642512 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.51268958 V-1 T = -25 °C: 14.93825365 V-1 |
Break-through voltage: | T = +20 °C: 408.3412371 V T = -25 °C: 372.1057017 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:10:31 CET | jreher | Updated box and position via API. |
29. Jan 2021 10:27:05 CET | jreher | Assigned to capsule by script |
06. Oct 2020 16:52:31 CEST | jreher | Updated box and position via API. |
11. Aug 2020 17:31:41 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:59:22 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:24:28 CET | jreher | Updated box and position via API. |
30. Jul 2019 15:17:58 CEST | spankonin | Updated APD batch assignment via API. |
23. Jul 2019 10:10:09 CEST | markus.moritz | |
05. Jul 2019 13:59:02 CEST | jreher | Updated APD location via API. |
24. Jun 2019 16:16:07 CEST | spankonin | Updated APD batch assignment via API. |
03. Jan 2019 00:12:18 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:12:05 CET | Tobias | Imported from Hamamatsu datasheet. |