RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028300 - Archived data from Fri, 05. February 2021 11:10:29 CET


This is all the information about APD 2510028300. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028300
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.6 V
Dark current: 8.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 172
Position in Box: 30
EP1 batch: 27
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.6510956 V     T = -25 °C: 348.1200934 V
Voltage for Gain 150: T = +20 °C: 391.5098091 V     T = -25 °C: 355.5890447 V
Voltage for Gain 200: T = +20 °C: 395.8654238 V     T = -25 °C: 359.7685067 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.376734317 V-1     T = -25 °C: 4.800351635 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.561024354 V-1     T = -25 °C: 8.908927685 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.99909984 V-1     T = -25 °C: 15.81903307 V-1
Break-through voltage: T = +20 °C: 406.5851436 V     T = -25 °C: 375.524062 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:43:15 CET jreher Assigned to capsule by script
05. Feb 2021 11:10:29 CET jreher Updated box and position via API.
18. Dec 2020 14:00:37 CET jreher Updated box and position via API.
11. Aug 2020 17:31:39 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:22 CET jreher Updated APD location via API.
25. Nov 2019 17:24:27 CET jreher Updated box and position via API.
30. Jul 2019 15:17:57 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:05:55 CEST markus.moritz
05. Jul 2019 13:59:01 CEST jreher Updated APD location via API.
24. Jun 2019 16:16:06 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:18 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:05 CET Tobias Imported from Hamamatsu datasheet.