RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028295 - Archived data from Fri, 05. February 2021 11:10:29 CET


This is all the information about APD 2510028295. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028295
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.4 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 172
Position in Box: 25
EP1 batch: 27
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.6643392 V     T = -25 °C: 348.1507521 V
Voltage for Gain 150: T = +20 °C: 391.4843049 V     T = -25 °C: 355.5554416 V
Voltage for Gain 200: T = +20 °C: 395.8232995 V     T = -25 °C: 359.7008408 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.420810313 V-1     T = -25 °C: 4.881714481 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.727187467 V-1     T = -25 °C: 9.10912441 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.42743901 V-1     T = -25 °C: 16.46996418 V-1
Break-through voltage: T = +20 °C: 411.0211619 V     T = -25 °C: 374.8802333 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:35:42 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:59 CEST jreher Updated box and position via API.
05. Feb 2021 11:10:29 CET jreher Updated box and position via API.
11. Aug 2020 17:31:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:21 CET jreher Updated APD location via API.
25. Nov 2019 17:24:27 CET jreher Updated box and position via API.
30. Jul 2019 15:17:56 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:02:50 CEST markus.moritz
05. Jul 2019 13:59:00 CEST jreher Updated APD location via API.
24. Jun 2019 16:16:05 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:18 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:05 CET Tobias Imported from Hamamatsu datasheet.