RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028291 - Archived data from Tue, 11. August 2020 17:31:38 CEST


This is all the information about APD 2510028291. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028291
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 172
Position in Box: 21
EP1 batch: 27
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.9772467 V     T = -25 °C: 347.004766 V
Voltage for Gain 150: T = +20 °C: 389.8071625 V     T = -25 °C: 354.5086873 V
Voltage for Gain 200: T = +20 °C: 394.151588 V     T = -25 °C: 358.744687 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.651110353 V-1     T = -25 °C: 4.913080479 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.281423245 V-1     T = -25 °C: 8.948431827 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59893758 V-1     T = -25 °C: 15.76941955 V-1
Break-through voltage: T = +20 °C: 411.8609401 V     T = -25 °C: 373.6120305 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:28 CET jreher Updated box and position via API.
11. Aug 2020 17:31:38 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:21 CET jreher Updated APD location via API.
25. Nov 2019 17:24:26 CET jreher Updated box and position via API.
30. Jul 2019 15:17:56 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:01:37 CEST markus.moritz
05. Jul 2019 13:59:00 CEST jreher Updated APD location via API.
24. Jun 2019 16:16:05 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:17 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:05 CET Tobias Imported from Hamamatsu datasheet.