RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028289 - Archived data from Wed, 07. October 2020 12:18:43 CEST


This is all the information about APD 2510028289. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028289
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2510028289/2314025321
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 12.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 172
Position in Box: 19
EP1 batch: 27
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1265434 V     T = -25 °C: 343.1517004 V
Voltage for Gain 150: T = +20 °C: 385.9309291 V     T = -25 °C: 350.4309333 V
Voltage for Gain 200: T = +20 °C: 390.2636687 V     T = -25 °C: 354.5158708 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.597182315 V-1     T = -25 °C: 4.986324221 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.247586455 V-1     T = -25 °C: 9.37879322 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.57536073 V-1     T = -25 °C: 14.94147713 V-1
Break-through voltage: T = +20 °C: 405.7467946 V     T = -25 °C: 369.5763825 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:28 CET jreher Updated box and position via API.
07. Oct 2020 12:18:43 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:00 CEST jreher Updated box and position via API.
11. Aug 2020 17:31:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:21 CET jreher Updated APD location via API.
25. Nov 2019 17:24:26 CET jreher Updated box and position via API.
30. Jul 2019 15:17:56 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:01:05 CEST markus.moritz
05. Jul 2019 13:59:00 CEST jreher Updated APD location via API.
24. Jun 2019 16:16:05 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:17 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:05 CET Tobias Imported from Hamamatsu datasheet.