RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028274 - Archived data from Tue, 11. August 2020 17:31:35 CEST


This is all the information about APD 2510028274. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028274
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2810031549/2510028274
Unit: #1034 (barcode 1309011247)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.1 V
Dark current: 6.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 172
Position in Box: 7
EP1 batch: 26
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.405584 V     T = -25 °C: 348.4761584 V
Voltage for Gain 150: T = +20 °C: 392.1754727 V     T = -25 °C: 355.8980872 V
Voltage for Gain 200: T = +20 °C: 396.483586 V     T = -25 °C: 360.0378302 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.697441024 V-1     T = -25 °C: 4.81281041 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.212238832 V-1     T = -25 °C: 8.979067437 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.73223114 V-1     T = -25 °C: 16.20631522 V-1
Break-through voltage: T = +20 °C: 411.6032686 V     T = -25 °C: 375.3418479 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:27 CET jreher Updated box and position via API.
11. Aug 2020 17:31:35 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:45:24 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:21 CET jreher Updated box and position via API.
27. Nov 2019 19:59:20 CET jreher Updated APD location via API.
25. Nov 2019 17:24:25 CET jreher Updated box and position via API.
30. Jul 2019 15:17:44 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:53:44 CEST markus.moritz
05. Jul 2019 13:58:59 CEST jreher Updated APD location via API.
24. Jun 2019 14:50:26 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:17 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:04 CET Tobias Imported from Hamamatsu datasheet.