RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028261 - Archived data from Wed, 07. October 2020 12:28:09 CEST


This is all the information about APD 2510028261. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028261
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1915021408/2510028261
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 171
Position in Box: 47
EP1 batch: 26
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2766943 V     T = -25 °C: 343.5394646 V
Voltage for Gain 150: T = +20 °C: 386.9814895 V     T = -25 °C: 350.9203843 V
Voltage for Gain 200: T = +20 °C: 391.227283 V     T = -25 °C: 355.0518916 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.700530572 V-1     T = -25 °C: 4.847213826 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.656553307 V-1     T = -25 °C: 8.938745545 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.41326441 V-1     T = -25 °C: 16.15930096 V-1
Break-through voltage: T = +20 °C: 405.2028533 V     T = -25 °C: 369.9976228 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:24 CET jreher Updated box and position via API.
07. Oct 2020 12:28:09 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:38 CEST jreher Updated box and position via API.
11. Aug 2020 17:31:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:12 CET jreher Updated APD location via API.
25. Nov 2019 17:24:24 CET jreher Updated box and position via API.
30. Jul 2019 15:17:44 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:50:01 CEST markus.moritz
05. Jul 2019 13:58:53 CEST jreher Updated APD location via API.
24. Jun 2019 14:50:25 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:17 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:04 CET Tobias Imported from Hamamatsu datasheet.