RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2510028257 - Archived data from Fri, 05. February 2021 11:10:24 CET


This is all the information about APD 2510028257. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2510028257
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 171
Position in Box: 26
EP1 batch: 26
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4477342 V     T = -25 °C: 347.5381838 V
Voltage for Gain 150: T = +20 °C: 390.3326923 V     T = -25 °C: 354.85992 V
Voltage for Gain 200: T = +20 °C: 394.7235055 V     T = -25 °C: 358.9632981 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.511715296 V-1     T = -25 °C: 5.098693792 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.055511332 V-1     T = -25 °C: 9.075857106 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.04761878 V-1     T = -25 °C: 16.72467863 V-1
Break-through voltage: T = +20 °C: 410.7734521 V     T = -25 °C: 374.3878303 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:22 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:24 CET jreher Updated box and position via API.
11. Aug 2020 17:31:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:12 CET jreher Updated APD location via API.
25. Nov 2019 17:24:23 CET jreher Updated box and position via API.
30. Jul 2019 15:17:43 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:48:01 CEST markus.moritz
05. Jul 2019 13:58:53 CEST jreher Updated APD location via API.
24. Jun 2019 14:50:25 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:17 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:04 CET Tobias Imported from Hamamatsu datasheet.