RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028240 - Archived data from Tue, 11. August 2020 17:31:32 CEST


This is all the information about APD 2509028240. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028240
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.4 V
Dark current: 9.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 171
Position in Box: 24
EP1 batch: 26
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.4966893 V     T = -25 °C: 344.0870348 V
Voltage for Gain 150: T = +20 °C: 386.3422145 V     T = -25 °C: 351.3037401 V
Voltage for Gain 200: T = +20 °C: 390.7239776 V     T = -25 °C: 355.352198 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.431924973 V-1     T = -25 °C: 5.076095978 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.936550824 V-1     T = -25 °C: 9.818623718 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.97605695 V-1     T = -25 °C: 16.01626005 V-1
Break-through voltage: T = +20 °C: 406.6499393 V     T = -25 °C: 370.4848105 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:22 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:23 CET jreher Updated box and position via API.
11. Aug 2020 17:31:32 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:11 CET jreher Updated APD location via API.
25. Nov 2019 17:24:23 CET jreher Updated box and position via API.
30. Jul 2019 15:17:43 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:46:29 CEST markus.moritz
05. Jul 2019 13:58:53 CEST jreher Updated APD location via API.
24. Jun 2019 14:50:24 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:16 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:04 CET Tobias Imported from Hamamatsu datasheet.