RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028233 - Archived data from Tue, 11. August 2020 17:31:31 CEST


This is all the information about APD 2509028233. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028233
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 171
Position in Box: 22
EP1 batch: 26
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0116141 V     T = -25 °C: 344.9266189 V
Voltage for Gain 150: T = +20 °C: 387.8488835 V     T = -25 °C: 352.2685533 V
Voltage for Gain 200: T = +20 °C: 392.2076891 V     T = -25 °C: 356.3957427 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.602304307 V-1     T = -25 °C: 5.003207088 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.265824812 V-1     T = -25 °C: 9.441528018 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.56162515 V-1     T = -25 °C: 15.01436169 V-1
Break-through voltage: T = +20 °C: 408.0940744 V     T = -25 °C: 371.8006337 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 15:06:26 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:42 CEST oafedulidis Updated box and position via API.
03. May 2021 10:25:22 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:22 CET jreher Updated box and position via API.
11. Aug 2020 17:31:31 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:11 CET jreher Updated APD location via API.
25. Nov 2019 17:24:22 CET jreher Updated box and position via API.
30. Jul 2019 15:17:30 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:42:02 CEST markus.moritz
05. Jul 2019 13:58:52 CEST jreher Updated APD location via API.
24. Jun 2019 14:50:24 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:16 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:04 CET Tobias Imported from Hamamatsu datasheet.