RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028223 - Archived data from Fri, 05. February 2021 11:10:21 CET


This is all the information about APD 2509028223. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028223
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381 V
Dark current: 7.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 171
Position in Box: 15
EP1 batch: 25
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.6066703 V     T = -25 °C: 346.2941677 V
Voltage for Gain 150: T = +20 °C: 389.4975594 V     T = -25 °C: 353.7281577 V
Voltage for Gain 200: T = +20 °C: 393.8888445 V     T = -25 °C: 357.8927925 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.429647 V-1     T = -25 °C: 4.823286149 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.582260054 V-1     T = -25 °C: 9.822962529 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.04975733 V-1     T = -25 °C: 15.80730088 V-1
Break-through voltage: T = +20 °C: 409.650585 V     T = -25 °C: 373.4648138 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:21 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:21 CET jreher Updated box and position via API.
11. Aug 2020 17:31:29 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:10 CET jreher Updated APD location via API.
25. Nov 2019 17:24:21 CET jreher Updated box and position via API.
30. Jul 2019 15:17:29 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:38:56 CEST markus.moritz
05. Jul 2019 13:58:51 CEST jreher Updated APD location via API.
24. Jun 2019 14:47:03 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:16 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:04 CET Tobias Imported from Hamamatsu datasheet.