RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028205 - Archived data from Tue, 11. August 2020 17:31:26 CEST


This is all the information about APD 2509028205. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028205
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G05
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 11 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 171
Position in Box: 3
EP1 batch: 25
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3243281 V     T = -25 °C: 343.4310176 V
Voltage for Gain 150: T = +20 °C: 386.213032 V     T = -25 °C: 350.848201 V
Voltage for Gain 200: T = +20 °C: 390.6286611 V     T = -25 °C: 355.02671 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.585916109 V-1     T = -25 °C: 4.774597706 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.92255688 V-1     T = -25 °C: 8.893111114 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1138233 V-1     T = -25 °C: 16.27546762 V-1
Break-through voltage: T = +20 °C: 406.6571578 V     T = -25 °C: 370.6013772 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:25:20 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:19 CET jreher Updated box and position via API.
11. Aug 2020 17:31:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:09 CET jreher Updated APD location via API.
25. Nov 2019 17:24:20 CET jreher Updated box and position via API.
30. Jul 2019 15:17:17 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:29:28 CEST markus.moritz
05. Jul 2019 13:58:50 CEST jreher Updated APD location via API.
24. Jun 2019 14:47:02 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:15 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:03 CET Tobias Imported from Hamamatsu datasheet.