RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028202 - Archived data from Tue, 11. August 2020 17:31:25 CEST


This is all the information about APD 2509028202. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028202
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2509028202/0823009022
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 170
Position in Box: 50
EP1 batch: 24
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2554365 V     T = -25 °C: 346.0386633 V
Voltage for Gain 150: T = +20 °C: 389.1233584 V     T = -25 °C: 353.4131166 V
Voltage for Gain 200: T = +20 °C: 393.4959409 V     T = -25 °C: 357.5962873 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.653391982 V-1     T = -25 °C: 4.981047782 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.080041074 V-1     T = -25 °C: 9.349885817 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.5001777 V-1     T = -25 °C: 15.00134087 V-1
Break-through voltage: T = +20 °C: 409.1309638 V     T = -25 °C: 372.9143638 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:17 CET jreher Updated box and position via API.
11. Aug 2020 17:31:25 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:22:03 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:40 CET jreher Updated box and position via API.
27. Nov 2019 19:59:01 CET jreher Updated APD location via API.
25. Nov 2019 17:24:19 CET jreher Updated box and position via API.
30. Jul 2019 15:17:17 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:28:36 CEST markus.moritz
05. Jul 2019 13:58:46 CEST jreher Updated APD location via API.
24. Jun 2019 14:01:31 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:15 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:03 CET Tobias Imported from Hamamatsu datasheet.