RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028196 - Archived data from Tue, 11. August 2020 17:31:24 CEST


This is all the information about APD 2509028196. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028196
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2509028196/2419027423
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: No
Storage Box: 170
Position in Box: 45
EP1 batch: 24
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.7293282 V     T = -25 °C: 346.8208991 V
Voltage for Gain 150: T = +20 °C: 390.4143931 V     T = -25 °C: 354.1523465 V
Voltage for Gain 200: T = +20 °C: 394.6982579 V     T = -25 °C: 358.2701411 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.410454743 V-1     T = -25 °C: 4.698097158 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.036519269 V-1     T = -25 °C: 9.693902752 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.461967 V-1     T = -25 °C: 15.76076862 V-1
Break-through voltage: T = +20 °C: 409.5003531 V     T = -25 °C: 373.0383214 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:16 CET jreher Updated box and position via API.
11. Aug 2020 17:31:24 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:07:07 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:48 CET jreher Updated box and position via API.
27. Nov 2019 19:59:01 CET jreher Updated APD location via API.
25. Nov 2019 17:24:19 CET jreher Updated box and position via API.
30. Jul 2019 15:17:16 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:27:11 CEST markus.moritz
05. Jul 2019 13:58:45 CEST jreher Updated APD location via API.
24. Jun 2019 14:01:30 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:15 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:03 CET Tobias Imported from Hamamatsu datasheet.