RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028194 - Archived data from Wed, 07. October 2020 12:19:09 CEST


This is all the information about APD 2509028194. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028194
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2303024382/2509028194
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 383.7 V
Dark current: 12.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 170
Position in Box: 43
EP1 batch: 24
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 16. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.116748 V     T = -25 °C: 348.0152855 V
Voltage for Gain 150: T = +20 °C: 391.005682 V     T = -25 °C: 355.3977556 V
Voltage for Gain 200: T = +20 °C: 395.3849927 V     T = -25 °C: 359.5458671 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.685827854 V-1     T = -25 °C: 5.044667512 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.274927043 V-1     T = -25 °C: 9.510748045 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.62749244 V-1     T = -25 °C: 15.12384938 V-1
Break-through voltage: T = +20 °C: 408.884555 V     T = -25 °C: 374.4592073 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:16 CET jreher Updated box and position via API.
07. Oct 2020 12:19:09 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:05 CEST jreher Updated box and position via API.
11. Aug 2020 17:31:24 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:59:00 CET jreher Updated APD location via API.
25. Nov 2019 17:24:18 CET jreher Updated box and position via API.
30. Jul 2019 15:17:16 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 09:26:35 CEST markus.moritz
05. Jul 2019 13:58:45 CEST jreher Updated APD location via API.
24. Jun 2019 14:01:30 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:15 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:03 CET Tobias Imported from Hamamatsu datasheet.