RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2509028175 - Archived data from Tue, 11. August 2020 17:31:20 CEST


This is all the information about APD 2509028175. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2509028175
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.7 V
Dark current: 7.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 170
Position in Box: 26
EP1 batch: 24
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7610274 V     T = -25 °C: 345.7859372 V
Voltage for Gain 150: T = +20 °C: 388.6767323 V     T = -25 °C: 353.2096216 V
Voltage for Gain 200: T = +20 °C: 393.0774354 V     T = -25 °C: 357.3834715 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.377575381 V-1     T = -25 °C: 4.666203142 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.48863264 V-1     T = -25 °C: 9.40632139 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.74316239 V-1     T = -25 °C: 14.91319064 V-1
Break-through voltage: T = +20 °C: 408.5574865 V     T = -25 °C: 372.6882558 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:14 CET jreher Updated box and position via API.
07. Oct 2020 12:09:41 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:20 CEST jreher Updated box and position via API.
11. Aug 2020 17:31:20 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:59 CET jreher Updated APD location via API.
25. Nov 2019 17:24:17 CET jreher Updated box and position via API.
30. Jul 2019 15:16:42 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 12:17:06 CEST markus.moritz
05. Jul 2019 13:58:44 CEST jreher Updated APD location via API.
24. Jun 2019 14:01:29 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:14 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:03 CET Tobias Imported from Hamamatsu datasheet.