RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2508028156 - Archived data from Fri, 29. January 2021 10:24:45 CET


This is all the information about APD 2508028156. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2508028156
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2508028156/0823009000
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.4 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 170
Position in Box: 11
EP1 batch: 23
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.3046045 V     T = -25 °C: 344.3136414 V
Voltage for Gain 150: T = +20 °C: 387.1697591 V     T = -25 °C: 351.6460604 V
Voltage for Gain 200: T = +20 °C: 391.5727893 V     T = -25 °C: 355.7480915 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.539582059 V-1     T = -25 °C: 4.869981222 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.888564538 V-1     T = -25 °C: 9.116191612 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.81792959 V-1     T = -25 °C: 16.42448332 V-1
Break-through voltage: T = +20 °C: 407.6785282 V     T = -25 °C: 371.2264425 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:10:12 CET jreher Updated box and position via API.
29. Jan 2021 10:24:45 CET jreher Assigned to capsule by script
06. Oct 2020 16:52:14 CEST jreher Updated box and position via API.
11. Aug 2020 17:31:18 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:58 CET jreher Updated APD location via API.
25. Nov 2019 17:24:16 CET jreher Updated box and position via API.
30. Jul 2019 15:16:41 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 17:11:51 CEST markus.moritz
05. Jul 2019 13:58:43 CEST jreher Updated APD location via API.
24. Jun 2019 13:56:26 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:14 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:03 CET Tobias Imported from Hamamatsu datasheet.