RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2508028144 - Archived data from Tue, 11. August 2020 17:31:16 CEST


This is all the information about APD 2508028144. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2508028144
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 169
Position in Box: 32
EP1 batch: 23
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.8349204 V     T = -25 °C: 344.191614 V
Voltage for Gain 150: T = +20 °C: 386.6519584 V     T = -25 °C: 351.6213525 V
Voltage for Gain 200: T = +20 °C: 391.0099611 V     T = -25 °C: 355.8121513 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.408512994 V-1     T = -25 °C: 4.882324849 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.58019423 V-1     T = -25 °C: 9.056685639 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.03683549 V-1     T = -25 °C: 16.20857052 V-1
Break-through voltage: T = +20 °C: 407.9281449 V     T = -25 °C: 370.6486591 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:28:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:09 CET jreher Updated box and position via API.
11. Aug 2020 17:31:16 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:50 CET jreher Updated APD location via API.
25. Nov 2019 17:24:14 CET jreher Updated box and position via API.
30. Jul 2019 15:16:40 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 09:59:38 CEST markus.moritz
05. Jul 2019 13:58:38 CEST jreher Updated APD location via API.
24. Jun 2019 13:56:25 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:14 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:03 CET Tobias Imported from Hamamatsu datasheet.