RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2508028109 - Archived data from Fri, 05. February 2021 11:10:06 CET


This is all the information about APD 2508028109. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2508028109
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.5 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 169
Position in Box: 21
EP1 batch: 22
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8740439 V     T = -25 °C: 348.8827457 V
Voltage for Gain 150: T = +20 °C: 391.8067409 V     T = -25 °C: 356.2670697 V
Voltage for Gain 200: T = +20 °C: 396.2162775 V     T = -25 °C: 360.4189593 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.318568455 V-1     T = -25 °C: 4.583552495 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.485220008 V-1     T = -25 °C: 9.468721722 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.81409004 V-1     T = -25 °C: 15.30476758 V-1
Break-through voltage: T = +20 °C: 411.5996418 V     T = -25 °C: 375.4002848 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:59:03 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:02:10 CEST oafedulidis Updated box and position via API.
26. Apr 2021 14:28:32 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:06 CET jreher Updated box and position via API.
11. Aug 2020 17:31:13 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:48 CET jreher Updated APD location via API.
25. Nov 2019 17:24:13 CET jreher Updated box and position via API.
30. Jul 2019 15:16:04 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 09:40:19 CEST markus.moritz
05. Jul 2019 13:58:36 CEST jreher Updated APD location via API.
24. Jun 2019 13:38:18 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:13 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:02 CET Tobias Imported from Hamamatsu datasheet.