RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2508028107 - Archived data from Fri, 18. December 2020 13:59:41 CET


This is all the information about APD 2508028107. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2508028107
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G06
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 382.7 V
Dark current: 9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 169
Position in Box: 30
EP1 batch: 22
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8972359 V     T = -25 °C: 346.5627796 V
Voltage for Gain 150: T = +20 °C: 389.7305443 V     T = -25 °C: 353.9835327 V
Voltage for Gain 200: T = +20 °C: 394.0842742 V     T = -25 °C: 358.1187533 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.322571448 V-1     T = -25 °C: 4.879530608 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.669964489 V-1     T = -25 °C: 9.968183641 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.41752197 V-1     T = -25 °C: 16.06854589 V-1
Break-through voltage: T = +20 °C: 409.1323762 V     T = -25 °C: 372.9077532 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:21:46 CET jreher Assigned to capsule by script
05. Feb 2021 11:10:06 CET jreher Updated box and position via API.
18. Dec 2020 13:59:41 CET jreher Updated box and position via API.
11. Aug 2020 17:31:12 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:48 CET jreher Updated APD location via API.
25. Nov 2019 17:24:13 CET jreher Updated box and position via API.
30. Jul 2019 15:16:04 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 09:48:18 CEST markus.moritz
05. Jul 2019 13:58:36 CEST jreher Updated APD location via API.
24. Jun 2019 13:38:18 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:13 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:02 CET Tobias Imported from Hamamatsu datasheet.