This is all the information about APD 2508028102. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2508028102 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | assigned to 2508028102/2309024868 |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | blue |
Manufacturer information: | |
Wafer position: | C06 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 381.4 V |
Dark current: | 6.5 nA |
Screening Logistics: | |
Available: | No |
Storage Box: | 169 |
Position in Box: | 27 |
EP1 batch: | 22 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 16. Jul 2019 |
Sent for analysis after irradiation: | 19. Jul 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 16. Jul 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 17. Jul 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 381.099052 V T = -25 °C: 346.1070074 V |
Voltage for Gain 150: | T = +20 °C: 388.9733122 V T = -25 °C: 353.4730733 V |
Voltage for Gain 200: | T = +20 °C: 393.3407929 V T = -25 °C: 357.5938104 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.510073582 V-1 T = -25 °C: 4.939236297 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.296927231 V-1 T = -25 °C: 9.434003177 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.80699665 V-1 T = -25 °C: 15.16648543 V-1 |
Break-through voltage: | T = +20 °C: 409.181318 V T = -25 °C: 372.9425802 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:10:06 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:31:11 CEST | jreher | Updated APD characteristics via API. |
25. Jun 2020 11:21:58 CEST | jreher | Assigned to capsule by script |
19. Feb 2020 11:53:40 CET | jreher | Updated box and position via API. |
27. Nov 2019 19:58:48 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:24:12 CET | jreher | Updated box and position via API. |
30. Jul 2019 15:16:04 CEST | spankonin | Updated APD batch assignment via API. |
19. Jul 2019 09:47:27 CEST | markus.moritz | |
05. Jul 2019 13:58:36 CEST | jreher | Updated APD location via API. |
24. Jun 2019 13:38:18 CEST | jgrochowski | Updated APD batch assignment via API. |
03. Jan 2019 00:12:13 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:12:02 CET | Tobias | Imported from Hamamatsu datasheet. |