RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2508028099 - Archived data from Fri, 05. February 2021 11:10:05 CET


This is all the information about APD 2508028099. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2508028099
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 8.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 169
Position in Box: 25
EP1 batch: 22
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.7466982 V     T = -25 °C: 345.1776324 V
Voltage for Gain 150: T = +20 °C: 387.628822 V     T = -25 °C: 352.4861125 V
Voltage for Gain 200: T = +20 °C: 392.0210264 V     T = -25 °C: 356.5592582 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.383392308 V-1     T = -25 °C: 4.899782585 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.696342114 V-1     T = -25 °C: 9.558483956 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33656657 V-1     T = -25 °C: 15.36975899 V-1
Break-through voltage: T = +20 °C: 408.0633993 V     T = -25 °C: 371.7985965 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:21:58 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:29 CET jreher Updated box and position via API.
05. Feb 2021 11:10:05 CET jreher Updated box and position via API.
11. Aug 2020 17:31:11 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:48 CET jreher Updated APD location via API.
25. Nov 2019 17:24:12 CET jreher Updated box and position via API.
30. Jul 2019 15:16:03 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 09:46:32 CEST markus.moritz
05. Jul 2019 13:58:36 CEST jreher Updated APD location via API.
24. Jun 2019 13:38:18 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:13 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:02 CET Tobias Imported from Hamamatsu datasheet.