RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2508028094 - Archived data from Wed, 14. April 2021 18:46:26 CEST


This is all the information about APD 2508028094. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2508028094
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2508028094/2304024476
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: H06
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 8 nA
   
Screening Logistics:  
Available: No
Storage Box: 169
Position in Box: 21
EP1 batch: 22
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.8494109 V     T = -25 °C: 349.5242933 V
Voltage for Gain 150: T = +20 °C: 391.8982172 V     T = -25 °C: 356.9171556 V
Voltage for Gain 200: T = +20 °C: 396.3834578 V     T = -25 °C: 361.0448173 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.28640341 V-1     T = -25 °C: 4.823825038 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.395659853 V-1     T = -25 °C: 8.946437283 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31419262 V-1     T = -25 °C: 16.29880322 V-1
Break-through voltage: T = +20 °C: 411.4068227 V     T = -25 °C: 376.0597962 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:06 CEST jreher Updated box and position via API.
14. Apr 2021 18:46:26 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:10:05 CET jreher Updated box and position via API.
11. Aug 2020 17:31:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:48 CET jreher Updated APD location via API.
25. Nov 2019 17:24:12 CET jreher Updated box and position via API.
30. Jul 2019 15:16:03 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 09:44:35 CEST markus.moritz
05. Jul 2019 13:58:36 CEST jreher Updated APD location via API.
24. Jun 2019 13:38:18 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:12 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:02 CET Tobias Imported from Hamamatsu datasheet.