RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2507028058 - Archived data from Tue, 11. August 2020 17:31:07 CEST


This is all the information about APD 2507028058. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2507028058
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B13
Break-through voltage: 423 V
Voltage for Gain 100 (T=+25°C): 394.7 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 169
Position in Box: 4
EP1 batch: 21
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 395.3653991 V     T = -25 °C: 358.8427891 V
Voltage for Gain 150: T = +20 °C: 403.1677035 V     T = -25 °C: 366.4571385 V
Voltage for Gain 200: T = +20 °C: 407.4913333 V     T = -25 °C: 370.7215717 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.537943496 V-1     T = -25 °C: 4.85536843 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.042528069 V-1     T = -25 °C: 8.888418346 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.27001057 V-1     T = -25 °C: 15.67821944 V-1
Break-through voltage: T = +20 °C: 421.9316234 V     T = -25 °C: 385.5580458 V
   
Notes:


Version history

Time Author Change comment
26. Apr 2021 14:28:31 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:10:03 CET jreher Updated box and position via API.
11. Aug 2020 17:31:07 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:46 CET jreher Updated APD location via API.
25. Nov 2019 17:24:11 CET jreher Updated box and position via API.
30. Jul 2019 15:15:50 CEST spankonin Updated APD batch assignment via API.
19. Jul 2019 09:27:11 CEST markus.moritz
05. Jul 2019 13:58:34 CEST jreher Updated APD location via API.
24. Jun 2019 13:27:21 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:12 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:02 CET Tobias Imported from Hamamatsu datasheet.