RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2507028027


This is all the information about APD 2507028027. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2507028027
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2507028027/2812031708
Unit: #2409 (barcode 1309024070)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 168
Position in Box: 25
EP1 batch: 20
EP1 batch after irradiation: 10110
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.876704 V     T = -25 °C: 349.1256233 V
Voltage for Gain 150: T = +20 °C: 392.7429163 V     T = -25 °C: 356.5656562 V
Voltage for Gain 200: T = +20 °C: 397.108072 V     T = -25 °C: 360.7139439 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.317502572 V-1     T = -25 °C: 4.930425823 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.617416713 V-1     T = -25 °C: 9.275770067 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.14408447 V-1     T = -25 °C: 14.72983032 V-1
Break-through voltage: T = +20 °C: 412.6989513 V     T = -25 °C: 375.9001556 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
20. Oct 2021 09:22:43 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:01 CEST jreher Updated box and position via API.
05. Feb 2021 11:09:57 CET jreher Updated box and position via API.
11. Aug 2020 17:31:02 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:37 CET jreher Updated APD location via API.
25. Nov 2019 17:24:08 CET jreher Updated box and position via API.
30. Jul 2019 15:15:16 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 15:55:56 CEST markus.moritz
05. Jul 2019 13:58:28 CEST jreher Updated APD location via API.
24. Jun 2019 13:23:07 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:11 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:01 CET Tobias Imported from Hamamatsu datasheet.