RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2507028016 - Archived data from Tue, 11. August 2020 17:30:59 CEST


This is all the information about APD 2507028016. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2507028016
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.4 V
Dark current: 7.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 168
Position in Box: 14
EP1 batch: 20
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0549683 V     T = -25 °C: 347.6771823 V
Voltage for Gain 150: T = +20 °C: 390.9230785 V     T = -25 °C: 355.0745939 V
Voltage for Gain 200: T = +20 °C: 395.2856505 V     T = -25 °C: 359.2064657 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.646279698 V-1     T = -25 °C: 4.744950538 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.275267837 V-1     T = -25 °C: 9.819218154 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.7834027 V-1     T = -25 °C: 15.97735167 V-1
Break-through voltage: T = +20 °C: 411.2931143 V     T = -25 °C: 374.6831327 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:11:26 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:16 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:09:56 CET jreher Updated box and position via API.
11. Aug 2020 17:30:59 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:35 CET jreher Updated APD location via API.
25. Nov 2019 17:24:07 CET jreher Updated box and position via API.
30. Jul 2019 15:15:15 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 15:51:24 CEST markus.moritz
05. Jul 2019 13:58:27 CEST jreher Updated APD location via API.
24. Jun 2019 13:23:06 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:11 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:01 CET Tobias Imported from Hamamatsu datasheet.