RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2507028015 - Archived data from Wed, 16. June 2021 16:04:42 CEST


This is all the information about APD 2507028015. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2507028015
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.3 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 168
Position in Box: 13
EP1 batch: 20
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6432393 V     T = -25 °C: 350.9985363 V
Voltage for Gain 150: T = +20 °C: 394.4785886 V     T = -25 °C: 358.4209493 V
Voltage for Gain 200: T = +20 °C: 398.8324241 V     T = -25 °C: 362.5674604 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.533367529 V-1     T = -25 °C: 4.938634096 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.928626062 V-1     T = -25 °C: 9.421255952 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.02131014 V-1     T = -25 °C: 15.02472686 V-1
Break-through voltage: T = +20 °C: 413.6960551 V     T = -25 °C: 377.2617532 V
   
Notes:


Version history

Time Author Change comment
19. Nov 2021 13:05:37 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:42 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:53 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:38 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:09:56 CET jreher Updated box and position via API.
11. Aug 2020 17:30:59 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:35 CET jreher Updated APD location via API.
25. Nov 2019 17:24:07 CET jreher Updated box and position via API.
30. Jul 2019 15:15:15 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 15:49:39 CEST markus.moritz
05. Jul 2019 13:58:27 CEST jreher Updated APD location via API.
24. Jun 2019 13:23:06 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:11 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:01 CET Tobias Imported from Hamamatsu datasheet.