RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2507028007 - Archived data from Tue, 16. February 2021 12:28:47 CET


This is all the information about APD 2507028007. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2507028007
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.6 V
Dark current: 7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 168
Position in Box: 6
EP1 batch: 20
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.750069 V     T = -25 °C: 348.246862 V
Voltage for Gain 150: T = +20 °C: 390.7304964 V     T = -25 °C: 355.494322 V
Voltage for Gain 200: T = +20 °C: 395.1741865 V     T = -25 °C: 359.5510941 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.346844888 V-1     T = -25 °C: 5.084208378 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.478635852 V-1     T = -25 °C: 9.584792503 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.83696602 V-1     T = -25 °C: 15.55800671 V-1
Break-through voltage: T = +20 °C: 411.354035 V     T = -25 °C: 374.5517558 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:03:55 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:47 CET jreher Updated box and position via API.
05. Feb 2021 11:09:55 CET jreher Updated box and position via API.
11. Aug 2020 17:30:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:58:35 CET jreher Updated APD location via API.
25. Nov 2019 17:24:06 CET jreher Updated box and position via API.
30. Jul 2019 15:15:14 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 15:46:49 CEST markus.moritz
05. Jul 2019 13:58:27 CEST jreher Updated APD location via API.
24. Jun 2019 13:23:06 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:10 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:01 CET Tobias Imported from Hamamatsu datasheet.