RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027968 - Archived data from Tue, 11. August 2020 17:29:56 CEST


This is all the information about APD 2505027968. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027968
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2505027968/2320025873
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 381.6 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: No
Storage Box: 177
Position in Box: 25
EP1 batch: 19
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.6279307 V     T = -25 °C: 346.1970874 V
Voltage for Gain 150: T = +20 °C: 389.4940046 V     T = -25 °C: 353.6288637 V
Voltage for Gain 200: T = +20 °C: 393.8826716 V     T = -25 °C: 357.8020669 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.414760026 V-1     T = -25 °C: 4.850732357 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.640319504 V-1     T = -25 °C: 9.040772568 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.17030687 V-1     T = -25 °C: 16.06816217 V-1
Break-through voltage: T = +20 °C: 410.0914876 V     T = -25 °C: 373.5336221 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:07 CET jreher Updated box and position via API.
11. Aug 2020 17:29:56 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:49 CEST jreher Assigned to capsule by script
13. Feb 2020 14:22:54 CET jreher Updated box and position via API.
27. Nov 2019 20:00:16 CET jreher Updated APD location via API.
25. Nov 2019 17:24:50 CET jreher Updated box and position via API.
18. Jul 2019 10:26:48 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 15:29:59 CEST markus.moritz
05. Jul 2019 14:50:14 CEST jreher Updated APD location via API.
24. Jun 2019 13:18:06 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:09 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.