RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027965 - Archived data from Mon, 17. May 2021 09:17:18 CEST


This is all the information about APD 2505027965. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027965
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B08
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.2 V
Dark current: 8.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 177
Position in Box: 22
EP1 batch: 19
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.7789053 V     T = -25 °C: 349.8514027 V
Voltage for Gain 150: T = +20 °C: 393.5738198 V     T = -25 °C: 357.2786118 V
Voltage for Gain 200: T = +20 °C: 397.8988676 V     T = -25 °C: 361.4690964 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.687259325 V-1     T = -25 °C: 4.954097001 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.630245508 V-1     T = -25 °C: 9.252264982 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.06867875 V-1     T = -25 °C: 14.56970984 V-1
Break-through voltage: T = +20 °C: 412.83125 V     T = -25 °C: 376.1129847 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:57:24 CEST oafedulidis Assigned to capsule by script
17. May 2021 09:17:18 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:07 CET jreher Updated box and position via API.
11. Aug 2020 17:29:56 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:16 CET jreher Updated APD location via API.
25. Nov 2019 17:24:50 CET jreher Updated box and position via API.
18. Jul 2019 10:26:48 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 15:12:45 CEST markus.moritz
05. Jul 2019 14:50:14 CEST jreher Updated APD location via API.
24. Jun 2019 13:18:06 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:09 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.