RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027964 - Archived data from Tue, 11. August 2020 17:29:56 CEST


This is all the information about APD 2505027964. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027964
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E12
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 177
Position in Box: 21
EP1 batch: 19
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.1356066 V     T = -25 °C: 349.4454302 V
Voltage for Gain 150: T = +20 °C: 392.9898059 V     T = -25 °C: 356.8575593 V
Voltage for Gain 200: T = +20 °C: 397.3516679 V     T = -25 °C: 361.0011926 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.59205065 V-1     T = -25 °C: 4.749119745 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.078598707 V-1     T = -25 °C: 9.760549811 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.29424056 V-1     T = -25 °C: 15.66230575 V-1
Break-through voltage: T = +20 °C: 412.1561769 V     T = -25 °C: 375.3524152 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:58:06 CEST jreher Updated box and position via API.
14. Apr 2021 18:46:29 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 11:11:07 CET jreher Updated box and position via API.
11. Aug 2020 17:29:56 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:16 CET jreher Updated APD location via API.
25. Nov 2019 17:24:50 CET jreher Updated box and position via API.
18. Jul 2019 10:26:48 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 15:12:04 CEST markus.moritz
05. Jul 2019 14:50:14 CEST jreher Updated APD location via API.
24. Jun 2019 13:18:06 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:09 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.