RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027948 - Archived data from Thu, 15. April 2021 17:00:44 CEST


This is all the information about APD 2505027948. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027948
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F11
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 382.4 V
Dark current: 4.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 177
Position in Box: 6
EP1 batch: 18
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4493706 V     T = -25 °C: 346.9944273 V
Voltage for Gain 150: T = +20 °C: 390.3019405 V     T = -25 °C: 354.3607968 V
Voltage for Gain 200: T = +20 °C: 394.6768035 V     T = -25 °C: 358.502123 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.484362068 V-1     T = -25 °C: 4.962238941 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.883848479 V-1     T = -25 °C: 9.359763479 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.8854497 V-1     T = -25 °C: 14.84729277 V-1
Break-through voltage: T = +20 °C: 409.9909413 V     T = -25 °C: 373.3211424 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:12:43 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:44 CEST jreher Updated box and position via API.
05. Feb 2021 11:11:05 CET jreher Updated box and position via API.
11. Aug 2020 17:29:53 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:15 CET jreher Updated APD location via API.
25. Nov 2019 17:24:49 CET jreher Updated box and position via API.
18. Jul 2019 10:26:46 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 14:50:16 CEST markus.moritz
05. Jul 2019 14:50:13 CEST jreher Updated APD location via API.
24. Jun 2019 13:08:55 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:09 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.