RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027945 - Archived data from Tue, 11. August 2020 17:29:52 CEST


This is all the information about APD 2505027945. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027945
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 177
Position in Box: 3
EP1 batch: 18
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.117849 V     T = -25 °C: 342.9750748 V
Voltage for Gain 150: T = +20 °C: 385.957174 V     T = -25 °C: 350.280215 V
Voltage for Gain 200: T = +20 °C: 390.3348796 V     T = -25 °C: 354.3811156 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.634640724 V-1     T = -25 °C: 4.998639193 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.136486869 V-1     T = -25 °C: 9.494809539 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.32324683 V-1     T = -25 °C: 15.17886829 V-1
Break-through voltage: T = +20 °C: 406.547656 V     T = -25 °C: 369.8006451 V
   
Notes:


Version history

Time Author Change comment
16. May 2022 13:33:13 CEST oafedulidis Updated box and position via API.
28. Apr 2021 13:29:36 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:05 CET jreher Updated box and position via API.
11. Aug 2020 17:29:52 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:15 CET jreher Updated APD location via API.
25. Nov 2019 17:24:48 CET jreher Updated box and position via API.
18. Jul 2019 10:26:46 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 14:48:33 CEST markus.moritz
05. Jul 2019 14:50:12 CEST jreher Updated APD location via API.
24. Jun 2019 13:08:55 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:09 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.