RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027937 - Archived data from Thu, 18. July 2019 10:27:22 CEST


This is all the information about APD 2505027937. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027937
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 176
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 388.3 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 45
EP1 batch: 18
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:02 CET jreher Updated box and position via API.
11. Aug 2020 17:29:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:07 CET jreher Updated APD location via API.
25. Nov 2019 17:24:47 CET jreher Updated box and position via API.
18. Jul 2019 10:27:22 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 13:55:32 CEST markus.moritz
05. Jul 2019 14:50:08 CEST jreher Updated APD location via API.
24. Jun 2019 13:08:54 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:08 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.