RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027929 - Archived data from Mon, 30. August 2021 14:08:40 CEST


This is all the information about APD 2505027929. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027929
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383.8 V
Dark current: 3.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 37
EP1 batch: 18
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4392525 V     T = -25 °C: 348.2799259 V
Voltage for Gain 150: T = +20 °C: 390.4254312 V     T = -25 °C: 355.6067686 V
Voltage for Gain 200: T = +20 °C: 394.8878835 V     T = -25 °C: 359.711308 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.477851424 V-1     T = -25 °C: 5.019472788 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.83548513 V-1     T = -25 °C: 9.468299013 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.52513893 V-1     T = -25 °C: 15.19046262 V-1
Break-through voltage: T = +20 °C: 410.1158198 V     T = -25 °C: 374.0916087 V
   
Notes:


Version history

Time Author Change comment
27. Jun 2022 12:43:25 CEST oafedulidis Assigned to capsule by script
30. Aug 2021 14:08:40 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:01 CET jreher Updated box and position via API.
11. Aug 2020 17:29:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:06 CET jreher Updated APD location via API.
25. Nov 2019 17:24:46 CET jreher Updated box and position via API.
18. Jul 2019 10:27:21 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 13:44:22 CEST markus.moritz
05. Jul 2019 14:50:07 CEST jreher Updated APD location via API.
24. Jun 2019 13:08:54 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:08 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.