RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027928 - Archived data from Wed, 07. October 2020 12:11:07 CEST


This is all the information about APD 2505027928. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027928
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2505027928/2320025818
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.2 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 176
Position in Box: 36
EP1 batch: 18
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3375036 V     T = -25 °C: 343.9220591 V
Voltage for Gain 150: T = +20 °C: 386.3487732 V     T = -25 °C: 351.2900567 V
Voltage for Gain 200: T = +20 °C: 390.8528699 V     T = -25 °C: 355.419027 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.504553835 V-1     T = -25 °C: 4.657479777 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.695543462 V-1     T = -25 °C: 9.562581353 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.51282979 V-1     T = -25 °C: 15.42874051 V-1
Break-through voltage: T = +20 °C: 407.2495288 V     T = -25 °C: 370.7863422 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:01 CET jreher Updated box and position via API.
07. Oct 2020 12:11:07 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:47 CEST jreher Updated box and position via API.
11. Aug 2020 17:29:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:06 CET jreher Updated APD location via API.
25. Nov 2019 17:24:46 CET jreher Updated box and position via API.
18. Jul 2019 10:27:21 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 13:49:50 CEST markus.moritz
05. Jul 2019 14:50:07 CEST jreher Updated APD location via API.
24. Jun 2019 13:08:54 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:08 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.