RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2505027924 - Archived data from Tue, 11. August 2020 17:29:48 CEST


This is all the information about APD 2505027924. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2505027924
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 176
Position in Box: 32
EP1 batch: 17
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 02. Jul 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3642938 V     T = -25 °C: 345.7796061 V
Voltage for Gain 150: T = +20 °C: 388.2564876 V     T = -25 °C: 353.0670026 V
Voltage for Gain 200: T = +20 °C: 392.6409464 V     T = -25 °C: 357.1328797 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.513859394 V-1     T = -25 °C: 4.82379492 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.017118243 V-1     T = -25 °C: 9.94485995 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1521316 V-1     T = -25 °C: 16.11080455 V-1
Break-through voltage: T = +20 °C: 408.0036548 V     T = -25 °C: 371.6213386 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:17:47 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:04 CEST jreher Updated box and position via API.
05. Feb 2021 11:11:00 CET jreher Updated box and position via API.
11. Aug 2020 17:29:48 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:06 CET jreher Updated APD location via API.
25. Nov 2019 17:24:46 CET jreher Updated box and position via API.
18. Jul 2019 10:27:21 CEST spankonin Updated APD batch assignment via API.
09. Jul 2019 13:47:32 CEST markus.moritz
05. Jul 2019 14:50:07 CEST jreher Updated APD location via API.
24. Jun 2019 13:05:57 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:08 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:00 CET Tobias Imported from Hamamatsu datasheet.